|
| UCI REPLACEMENT HOSPITAL (ORANGE, CA, USA)
|
|
Part of the design team for the 7 story, 480,000 sq.ft. hospital. Steel concentric brace frames, and composite steel framing is used as the main structural system.
| |
Architect: HOK
Structural Engineer of Record: Nabih Youssef and Associates
Francis Santiago was a Project Engineer for this project at NYA
|
|
 |
|
|