|
| 3333 Park Place (Irvine, CA, USA)
|
|
| Ten story building with a total square footage of 240,000 square foot. The structure has a steel Moment Frame for Lateral loads and the floor system is concrete filled metal deck with composite steel beams. The scope of work was to evaluate the existing structural frame in the aftermath of the North Ridge Earthquake. |
|
| |
Architect(1975): Welton Becket and Associates
Structural Engineer of Record(1975): Brandow& Johnston Structural Engineering
Structural Engineer for Seismic Evaluation: Nabih Youssef and Associates (2002) Francis Santiago was a Project Engineer for this project at NYA |
|
|
|