|
| 2 Town Center (Costa Mesa, CA, USA)
|
|
| Eighteen story building with a total square footage of 410,000 square foot. The structure has a Dual lateral system – Eccentric Brace Frame and Moment Frame and the floor system is concrete filled metal deck with composite steel beams. Lateral and gravity framing was designed in ETABS. |
|
| |
Architect: Johnson Fain
Structural Engineer of Record: Nabih Youssef and Associates Francis Santiago was a Project Engineer for this project at NYA |
|
|
|