|
| HIGHLAND Hospital - ACUTE CARE TOWER REPLACEMENT (OAKLAND, CA, USA)
|
|
| Two story concrete shear wall basement + eleven story Buckling Restrained Braced Frame (BRBF) structure, with a total footage of 255,500 sq.ft. The foundation system comprised of continuous wall footing around the perimeter of concrete shear walls and spread footings for interior columns. The concrete shear walls were designed to resist heavy uplift forces from the BRB frames. |
|
| |
Architect: Smith Group, Ratcliff, Shah Kawasaki
Structural Engineer of Record: Degenkolb Engineers, San Francisco
Structural Engineer: FSA, India
|
|
|
|